- Which of the following planning entities must you set up when you
configure a planning area? Note: There are 2 correct answers to this
question.
A. Planning operator
B. Time profile
C. Planning view template
D. Attribute
Answers : B, D
2. You need to limit value in projected periods of coverage to 999. What
must you do in the S&OP operator profile’s configuration?
A. Enter 999 as an allowed quota deviation parameter.
B. Enter 999 as an additional parameter.
C. Enter 999 as global limit per message type.
D. Enter 999 as infinite coverage parameter.
Answers : D
3. What are S&OP operator (optimizer) parameters associated with
demand fair share?
A. Number of fair share segments, Maximum days of coverage, Number
of fair share segments late delivery
B. Number of fair share segments, Maximum inventory, Additional tiering
costs (default)
C. Number of fair share segments, Additional tiering costs (default),
Target inventory violation cost
D. Number of fair share segments, Additional tiering costs (default),
Number of fair share segments late delivery
Answers : A
4. You created a time profile and want to use time levels. In which of the following cases is it
mandatory to set the time level?
There are 2 correct answers to this question.
A. Maintain a time profile level as parameter in a disaggregation planning operator.
B. Choose a time profile level in a planning view in Microsoft Excel.
C. Assign a time profile level for a planning level of a planning area.
D. Assign a time profile level during the load of key figure values with the Data
Integration Jobs app.
Answers : B, D
5. Which of the following planning entities must you set up when you configure a planning
area?
There are 2 correct answers to this question.
A. Planning View Template
B. Planning Operator
C. Attribute
D. Time Profile
Answers : C, D